After several design phases and model building that began in 2021, Lehm Ton Erde (LTE) carried out a first fire test on a test sample and a prototype at the end of 2022. Two years later, LTE developed and implemented a production system to manufacture almost 800 prefabricated hybrid wood and rammed earth ceiling elements in an on-site field factory within 100 production days.
The recipe for the rammed earth material was obtained from the limited excavation on site. Thanks to targeted preparations during the actual excavation and the careful securing and processing of the extracted material, the mixture could be produced directly next to the field factory. As a result, the LEHMIT consortium was founded with a positive forecast for this symbiotic, sustainable combination of materials.